Welcome to Indian Ports Association's Website....... ***** Comments on Recommendation of the Committee on Regulation of Stevedores and Shore Handling Agents in Major Ports invited. pl click "Notice/Adv of IPA" ***** Port Community System (PCS): All the messages related to Vessel, Container, Cargo, Transport, Finance , e-payment module and Eleven Customs related messages have been implemented)

PPP  & Captive Projects under Implementation

 As on 31.05.2020

Sl.
No
Project Cost Capacity (MMTPA)
(In Cr.)
JLN Port Trust
1 Development of Container Terminals of 2000 Mtrs Length at JNPT (4th Container terminal) 7915.00 60.00
Kamrajar Port Ltd. (Ennore)
2 Modification of existing  Iron Ore Terminal  to also handle coal (SIOTL) 229.00 12.00
3 Development of Marine Liquid Terminal -II on DBFOT Basis 393.00 3.00
4 Development of LNG Terminal on Captive basis 5151.00 5.00
5 Development of IOCL Oil Jetty (Captive) 480.00 3.00
6 Construction of Coal Berth 3 for TANGEDCO (Captive) 235.14 9.00
7 Construction of Coal Berth 4 for TANGEDCO (Captive) 244.51 9.00
Deendayal Port Trust
8 Development of Oil Jetty to handle liquid cargo ship bunkering Terminal 233.50 3.39
9 Development of Marine Liquid Terminal Facilities consisting of SPM & Two product jetties in KPT waters at OOT,Vadinar on captive use basis  448.00 24.50
Kolkata Port Trust
10 Setting up of Liquid Cargo Handling Jetty at Shalukkhali, Haldia Dock -II 172.52 2.43
Mormugao Port Trust
11 Redevelopment of Berths 8, 9, and Barge Berths  1145.36 19.22
New Mangalore Port Trust
12 Provide Handling Equipment at Berth No. 18 (Old berth no.12) for Handling Bulk Cargo & Containers under PPP Mode 469.46 6.73
13 Mechanization of Berth No. 14 for handling Container and other clean cargo on PPP mode 280.71 6.02
Paradip Port Trust
14 Development New Coal Berth for handling of Coal imports at Paradip Port on BOT basis.  655.56 10.00
15 Development of Clean Multi-cargo Berth in Southern Dock 430.78 5.00
16 Development of Deep Draft Iron Ore berth. 740.19 10.00
17 Mechanisation of EQ1 to EQ3 berths 1437.76 30.00
Visakhapatnam Port Trust
18 Development of East Quay-1A (EQ-1A) berth on south side of EQ-1 berth in the Inner harbour of Visakhapatnam Port on DBFOT basis 313.39 7.36
19 Extension of existing container terminal  633.11 0.54 MTEUs
VOC Port Trust, Tuticorin
20 Construction of North Cargo Berth-II  332.16 7.00
21 Development of Shallow draught Berth on PPP mode  for handling construction materials 65.37 2.00
22 Development of facilities for  Handling Thermal Coal for SPIC Electric Power Corpn Pvt  Ltd (SEPC) 214.50 2.50
Mumbai Port Trust
23 Bunkering Terminal 50.00 2.00


PPP
 & Captive Projects under Operation

Sl. No Project Cost Capacity (MMTPA)
(In Cr.)
Chennai Port Trust
1 Container Terminal -1 M/s.CCTPL 790.60 31.30
2 Development of 2nd Container Terminal (M/s.CITPL) 783.32 29.50
Cochin Port Trust
3 Vallarpadam Container Terminal ICTT 2118.00 40.00
4 LNG Terminal 4182.00 5.00
5 Crude Oil Handling Facility for BPCL-Kochi Refinery (Formerly KRL - a Central PSU) (Captive) 720.00 13.00
JLN Port Trust
6 Container Terminal, NSICT 750.00 13.20
7 Extension of container berth by 330 m towards north 600.00 10.00
8 Third Container Terminal 1078.00 15.60
9 BPCL Jetty (Captive) 200.00 5.50
Kamrajar Port Ltd. (Ennore)
10 Development of Marine Liquid Terminal - I on DBFOT Basis 252.00 3.00
11 Development of Coal terminal for users other than TNEB on BOT basis 399.00 8.00
12 Development of Container Terminal on DBFOT basis
(2 phases) (Ph-1- Rs.724 Cr and Ph-2- Rs.546 Cr)
1270.00 16.80
13 Development of Multi Cargo berth on DBFOT Basis 151.00 2.00
14 Coal Berth-1 for TANGEDCO (Captive) 80.38 8.00
15 Coal Berth-2 for TANGEDCO (Captive) 8.00
Deendayal Port Trust
16 Development of 13th Berth other than liquid and container cargo berth 188.87 1.50
17 Development of 15th multipurpose cargo berth at Kandla 188.87 1.50
18 Container Freight Station 41.07 3.00
19 Dry Bulk Terminal off Terka near Tuna on BOT basis (Outside Kandla Creek) 1060.00 14.11
20 Development, operation & maintenance of Container Terminal (Berth 11&12) on BOT  159.81 7.20
21 Oil Jetty for IOCL (Captive) 20.70 2.00
22 Oil Jetty related facilities at Vadinar(ESSAR) (Captive) 750.00 13.50
23 Fifth Oil Jetty (IFFCO)(Captive) 24.00 2.00
24 Setting up of Captive Barge Jetty at Old Kandla (IFFCO) 27.00 1.50
Kolkata Port Trust
25 Multipurpose Berth No. 12 35.00 1.12
26 Multipurpose Berth No. 4A 150.00 2.00
Mormugao Port Trust
27 Development of Coal Handling Terminal at Berth No.-7 406.00 4.61
28 Bulk Cargo berths No. 5A & 6A 250.00 5.00
New Mangalore Port Trust
29 Setting up of Bulk Cement Handling facility  for M/s Ambuja Cement Ltd. (captive)  98.00 1.00
30 Construction of Captive Jetty for handling Coal by M/s. UPCL  376.52 5.40
Paradip Port Trust
31 Mechanisation of Cargo Handling Project-1 37.32 2.00
32 Mechanisation of Cargo Handling Project-2 25.13 2.00
33 Supply, installation of 3 Nos. Of 100 tonne HMC.
1) By OSL
2) By Bothra Shipping Services
3) By ABCT Pvt. Ltd.
87.75 3.75
34 Supply, installation of 3 Nos. of HMC
1) By Crew Pvt. Ltd.(60T)
2) By OSL(100 T)
3) By OSL(60 T)
87.75 3.25
35 Captive Fertilizer Berth to PPL 20.00 4.00
36 Captive Fertilizer Berth to IFFCO 26.17 4.00
37 Construction of SPM Captive Berth 500.00 15.00
38 Mechanization of Central Quay-III Berth 40.00 6.00
39 Construction of 2nd SPM Captive Berth 746.17 11.00
40 Construction of 3rd SPM Captive Berth 746.17 11.00
41 Development of South Oil Jetty (Captive) 222.29 10.00
Visakhapatnam Port Trust
42 Multipurpose Berths-EQ-8 & EQ-9 327.30 6.43
43 Container Terminal, Outer harbour 86.35 5.60
44 Development of WQ-6 berth for handling Dry Bulk Cargoes 114.50 2.08
45 Development of EQ-10 berth for handling Liquid Cargoes 55.38 1.84
46 Mechanized Coal handling facilities at GCB in the Outer Harbour 444.10 10.18
47 Development of EQ-1 Berth 323.18 6.41
48 Upgradation of existing facility in the outer harbor and creation of new facility in the inner harbor for handling Iron ore. 845.41 23.00
49 Single Point Mooring –Captive facility developed by H.P.C.L 643.48 8.00
VOC Port Trust, Tuticorin
50 Development of 7th Berth as Container Terminal 135.00 5.00
51 Berth No. 8 Container Terminal 312.32 7.20
52 Deployment of one number additional Harbour  Mobile Crane at III & IV 24.60 4.36
53 Upgardation of Mechanical handling equipments in Berth No.1 to Berth No.6 and Beth No. 9 49.20 8.72
54 NTPL Captive berth- North Cargo Berth I
(Captive)
43.72 6.30
55 Coal Jetty-I & II - 6.25